Jump to content

[X:CE 0.34.1] Production time estimate incorrect


Jebah

Recommended Posts

In my iron man save file attached to this post, if you take a look in my Indonesia base, you can see my Marauder has a workshop estimate of 3 days. This, as you recall, is represented to the nearest hour, so:

3x24=72 hours, according to the workshop.

But, when I go to the airplane tab, and look at my sort of built Marauder - the last hope of mankind, it says it's 108 hours to completion...

108/24 hours=4.5 days, according to the airplane tab.

Something is wrong somewhere, and I personally suspect the airplane tab is wrong.

AutosaveIM2015-12-27_21.45.17.sav

AutosaveIM2015-12-27_21.45.17.sav

AutosaveIM2015-12-27_21.45.17.sav

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...